Service stage
Pre-planningArchitectural designConstruction acceptanceOperation and maintenance
HOME >Service stage >Pre-planning

Green building

(1) Formulate the green strategy and positioning of the project

(2) Determine the green technology system

(3) Green economy feasibility study

(4) Write a special article on the preliminary design scheme of green building

 

BIM pre service

BIM service work plan

Base status modeling (site condition simulation)

Preliminary cost estimation (cost estimation, cost estimation)

Spatial planning (using spatial planning)

Base analysis (site analysis, site status analysis)

Design achievement review duration planning (stage analysis)

Comparison and selection of design schemes (scheme comparison and decision-making, planning scheme display / review, conceptual design comparison and selection)

Design scheme (structural design scheme, electromechanical design scheme)

 

Design evaluation

Conceptual design finalization

Building performance simulation analysis (building performance analysis and Design)

Visual simulation (cocoa visualization, 3D visual presentation)

Space design, design drawing review and verification (construction management design drawing review)

Land use and transportation planning (traffic impact simulation)

 

BIM bidding services

Cooperate with the project bidding unit to build the model with BIM, make relevant animation production such as progress simulation, construction scheme simulation and roaming, and prepare BIM scheme.